
Guangzhou Tengsong Construction Machinery Equipment Co., Ltd
DAILY REFINING品牌始终追求环保节能、零故障率,甄选工程机械市场最高品质配件,有效延长使用寿命, 是目前全球最具竞争力的工程机械发动机配件供应商。 DAILY REFINING品牌:品质与创新的发动机零部件品牌 DAILY REFINING 是一个致力于提供高品质创新型发动机零部件的品牌。通过持续的研发和严格的质量控制,DAILY REFINING 为全球汽车和机械行业提供高品质的发动
Add to Cart
Engine Gasket Kit for Isuzu 4le1 5-87812810-6
part number: | 5-87812810-6 |
For models: | 4LE1 |
weight | 1.5KG |
Warranty period: | 1 year |
Quality: | high quality low price long life |
Gasket kit care introduction
For 4LE1 engine gasket kit maintenance, here are some suggestions:
1. Periodic Inspections: Periodically inspect the condition of the gasket kit, especially at the inspection points specified in the engine maintenance schedule. Pay attention to whether there are oil leaks, coolant leaks or other abnormal signs.
2. Replacement cycle: Replace the gasket set regularly according to the manufacturer's recommendations and usage conditions. Typically, gasket kit replacement intervals should follow those specified in the engine maintenance manual.
3. Use the right material: When replacing a gasket set, make sure to choose a gasket of the right material that meets the manufacturer's requirements. Use a quality original or certified gasket kit to ensure tightness and reliability.
4. Proper lubrication: If the gasket kit requires lubricant or sealant, follow the manufacturer's recommendations. Be sure to use the appropriate lubricant and adhere to the specified application thickness and method.
5. Pay attention to temperature and pressure: The gasket kit works in a high-temperature and high-pressure environment, so ensure that the engine is running normally and that the temperature and pressure are controlled within the design range. Excessive temperatures and pressures can cause gasket failure or damage.
Gasket Kit Installation Instructions
Installation of a gasket kit is a highly technical task that requires a certain amount of expertise and experience. The following is an overview of general gasket kit installation steps, but be sure to refer to the relevant engine service manual or a professional technician for accurate installation instructions:
1. Preparation: Make sure the engine is cool, cut off the power supply, and drain the coolant and oil.
2. Remove the old gasket: According to the guidance of the engine maintenance manual, gradually remove the relevant parts, such as the cylinder head, oil pan, intake manifold, etc., to expose the gasket that needs to be replaced.
3. Clean surfaces: Before installing a new gasket, clean the mating surfaces thoroughly to make sure they are free of any dirt, grease, or residue from the old gasket. Use appropriate cleaners and tools for cleaning to avoid scratching or damaging surfaces.
4. Install new gaskets: Install new gaskets one by one according to the prescribed order and method. Make sure the gaskets are placed correctly and fit snugly against the corresponding parts. Some gaskets may require lubricant or sealant, follow the manufacturer's recommendations.
5. Assemble components: Reinstall cylinder head, oil pan, intake manifold and other components. Tighten the bolts or nuts step by step according to the specified torque value and sequence to ensure that the component is installed correctly and tightened to the specified torque.
6. Inspection and Testing: After completing the installation, check that all connections are properly installed and tightened. Refill the appropriate amount of coolant and engine oil, and perform relevant tests and adjustments to ensure normal engine operation.
Company Profile